Rubble-filled Trench Foundation

Horizontal rebar is laid in a network over the gravel with vertical rebar tied-in per local building code.
A concrete cap is poured on top of the rubble fill and horizontal rebar.
The
hybrid adobe covered strawbale wall is pinned to the cement
stem wall foundation by impaling the bales on the steel rebar.